From our beginnings in 2005 we have successfully completed over 2500 contracts for many varied applications however gaining ISO 9000 approval in January 2006 provided the backbone by which we could begin to offer for more ‘project – led’ type manufacturing. Since that milestone we have successfully completed bending for the following developments (amongst many others);
| Company Supplied | Project | Company Supplied | Project |
| LFF Scotland Ltd | BP Caspian (EOP De-Bottlenecking Project) | Doosan Babcock Energy | Eraring Power Station |
| Shell UK Ltd | Starling Development | IPP Mardale | Kizomba Satellites |
| Flangefitt Stainless Ltd | Triton PLEM 4” Gas Lift Bypass | IPP Mardale | Exxon Mobil GP-29-01-07 Version 2.0 |
| RBG Ltd | Don Southwest & West Don Development | Subsea 7 | BP Andrew Area Development |
| Flangefitt Stainless Ltd | Taqa Pelican Well | John Bell Pipeline | Apache Bacchus |
| Mardale Pipes Plus | BP Machar East W183 Development | HPF Energy | BP Magnus |
| Flangefitt Stainless Ltd | Talisman Hannay Pipeline Replacement | FAD International | Total Islay Project |
| Shell UK Ltd | Shell Pierce | Subsea 7 | Nexon Telford Water Injection |
| HPF Energy | Total North Alwyn | LFF Scotland Ltd | ConocoPhillips Clipper South |
| IPP Mardale | Kizomba Satellites | Flangefitt Stainless Ltd | BG NW Seymour Sidetrack Project |
| Subsea 7 | Apache Bacchus | Heerema Hartlepool | Ensign Field Development |
| John Bell Pipeline Ltd | Bravo To Charlie Riser | Subsea 7 | Total E&P Laggan Tormore |
| LFF Scotland Ltd | ConocoPhillips Clipper South | Flangefitt Stainless Ltd | Taqa Falcon Development |
These contracts were managed complete with the requisite quality requirements, many including third party inspectorates and all demanding full documentation packages both pre & post manufacture. Presently, we are in process with many similar contracts alongside our other more standard type of work.
As a company we take pride in ensuring that not only large, stringently specified projects are produced within time and quality constraints, but also that the smallest or most straightforward jobs receive equal attention to detail.